wrote in message
...
On 10.02.10 11:30, Paul Scott wrote:


Thinking about it, the whole question about what's happening on the NLL
may
be to do with the phased nature of the four tracking around Camden Town.
Perhaps the final transfer to Upminster will only be done when the second
phase of the work is complete, thinking back to discussions about the
reducton of the scope because of the bridge repairs needed at Camden Town
itself?


What's that about Upminster?


Upminster IECC (that's the NR signal centre there) eventually gets full
signalling control of the NLL...

Paul S


 