Default Acton Main Line (lack of) progress report


A new footbridge has been built over the line, but I don't think it has
glass in it yet. The site of the future station is nicely muddy but
that's it. I was aware that some of the improved stations on the western
end of the line were said to be lagging behind, but I suspect that not a
sod had been turned by December 2018.

quick google

It turns out contractors had not yet been appointed in January. I'm a
bit baffled by the article... surely work has been going on at Ealing
Broadway for at least a year.

https://www.newcivilengineer.com/lat...039105.article

--
Basil Jet - Current favourite song...
What by Bruce
https://www.youtube.com/watch?v=RtJEAud9vao

  #2   Report Post  
Old February 7th 19, 07:48 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Acton Main Line (lack of) progress report

Basil Jet wrote:

A new footbridge has been built over the line, but I don't think it has
glass in it yet. The site of the future station is nicely muddy but
that's it. I was aware that some of the improved stations on the western
end of the line were said to be lagging behind, but I suspect that not a
sod had been turned by December 2018.

quick google

It turns out contractors had not yet been appointed in January. I'm a
bit baffled by the article... surely work has been going on at Ealing
Broadway for at least a year.

https://www.newcivilengineer.com/lat...039105.article


Perhaps that was just the enabling work mentioned in the article?

  #3   Report Post  
Old February 7th 19, 08:43 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Acton Main Line (lack of) progress report

Basil Jet wrote:

A new footbridge has been built over the line, but I don't think it has
glass in it yet. The site of the future station is nicely muddy but
that's it. I was aware that some of the improved stations on the western
end of the line were said to be lagging behind, but I suspect that not a
sod had been turned by December 2018.

quick google

It turns out contractors had not yet been appointed in January. I'm a
bit baffled by the article... surely work has been going on at Ealing
Broadway for at least a year.

https://www.newcivilengineer.com/lat...039105.article


Work at Acton Main Line (surely it should be Acton Relief Line now that
there are no usable mainline platforms?) has been going on for several
months - the footbridge steelwork was erected recently but the concrete
foundations were being worked on well before Christmas.

Meanwhile at Ealing Broadway the new steps from the existing station
structure to the Down Relief/Up Main island have been installed, the old
steps to the down main platform have been removed.

At West Ealing the footbridge steelwork has also been erected recently.


Anna Noyd-Dryver


  #4   Report Post  
Old February 8th 19, 01:18 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Acton Main Line (lack of) progress report

On 07/02/2019 20:43, Anna Noyd-Dryver wrote:

Work at Acton Main Line (surely it should be Acton Relief Line now that
there are no usable mainline platforms?)


"Acton Elizabeth" would be my choice of replacement for the current
ridiculous name.

useful info snipped and appreciated

--
Basil Jet - Current favourite song...
What by Bruce
https://www.youtube.com/watch?v=RtJEAud9vao
  #5   Report Post  
Old February 8th 19, 10:50 AM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

As the new Old Oak Common station will be so close to Acton
Main Line, would it not be sensible to close this very little used
station and replace with a GWML addition to OOC station?


  #6   Report Post  
Old February 8th 19, 12:15 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Acton Main Line (lack of) progress report

On 08/02/2019 10:50, Robin9 wrote:
As the new Old Oak Common station will be so close to Acton
Main Line, would it not be sensible to close this very little used
station and replace with a GWML addition to OOC station?


It won't be that close. I estimate that West Ealing is closer to both
Hanwell and Ealing Broadway than Acton Main Line will be to Old Oak Common.

--
Basil Jet - Current favourite song...
What by Bruce
https://www.youtube.com/watch?v=RtJEAud9vao


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Latest Progress Or Lack Thereof Of Crossrail C[_2_] London Transport 6 May 9th 18 04:51 PM
Refurbishment (well, creation) of Acton Main Line station Basil Jet[_4_] London Transport 22 April 11th 16 12:32 PM
Thames Link Progress - Or Lack Of It Robin9 London Transport 7 October 31st 13 08:04 PM
West Anglia Main Line Progress Report - DfT [email protected] London Transport 36 April 2nd 09 12:17 PM
West Anglia Main Line Progress Report - DfT [email protected] London Transport 1 March 27th 09 10:20 PM


All times are GMT. The time now is 11:37 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017