Default Goblin to close for Electrification work

In article , (Someone
Somewhere) wrote:

On 16/02/2016 11:38, Basil Jet wrote:

I'm surprised they are not making them 5-car so they can pool spare
units with the North London Line (I assume they are connected at Clapham
Junction).

The NLL with the Goblin at Clapham Junction? Huh?


LOL!

I think he means Gospel Oak. The GOBLIN bay has a buffer stop at the west
end but I assume the through (freight) lines will be electrified too.

--
Colin Rosenstiel