View Single Post
  #8   Report Post  
Old February 17th 16, 02:49 PM posted to uk.transport.london
[email protected] spud@potato.field is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default Last class 378 goes 5 car

On Wed, 17 Feb 2016 09:44:42 -0600
wrote:
Because having to have two electrification systems in the Euston throat is a
considerable complication, particularly for the signalling. So it's likely
to lead to more failures.


So is there a high level of signal failures in that area?

--
Spud