View Single Post
  #6   Report Post  
Old November 22nd 17, 01:49 PM posted to uk.transport.london
[email protected] boltar@cylonHQ.com is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2017
Posts: 329
Default Widened lines moorgate spur

On Wed, 22 Nov 2017 13:23:23 +0000
Recliner wrote:
On Wed, 22 Nov 2017 07:02:48 -0600,
wrote:

In article ,
(Someone
Somewhere) wrote:

On 22/11/2017 12:20, David Cantrell wrote:
On Tue, Nov 21, 2017 at 03:55:28PM +0000,
wrote:
The latest london special issue of modern railways suggests that the
met line has finally been linked up with the remains of the widened
lines at moorgate via a spur at farringdon.

Seems odd. Why on earth would they bother?

Presumably to reduce the pressure on Aldgate and the flat junction
between Liverpool Street and Aldgate East. If you ever catch an H&C
train through there there's probably an 80% chance it will end up
stalled waiting for a Met line.


I though it was just for extra siding space at Farringdon?


I believe that's correct. The sidings will be long enough for S8
trains, though normally only S7s will be stabled there.


Yup, the article said stabling. Though I imagine they could use it as an
emergency termination point if the part between farringdon and moorgate
stuffs up. I wonder if it would need to be re-certified to carry passengers
or whether it'll inherit those as grandfather rights?