View Single Post
  #5   Report Post  
Old May 29th 19, 06:38 PM posted to uk.transport.london,uk.railway
Basil Jet[_4_] Basil Jet[_4_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Tottenham Hale NR

On 07/04/2019 20:28, Basil Jet wrote:

Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?


I've found an answer to this at
https://www.ianvisits.co.uk/blog/201...-close-in-may/

++++++++++++
First of all, Network Rail heavily value engineered the route,
destroying any passive provision there would have been, see my FOI on
this:
https://www.whatdotheyknow.com/reque...engineering_ex

Furthermore, even the previous planning documents prior to the value
engineering conceded that track would have to be re-laid for quad
tracking. This means demolition of signalling and overhead wires and a
long period when Northumberland Park and Meridian Water will be closed
during that period of reconstruction. Clearly a lack of joint up
thinking, forward planning and accountability from Network Rail, are we
surprised?

Secondly, whilst the new station is opening, Abellio Greater Anglia
confirmed at the recent stakeholder meeting that the third track is not
ready and will not be operational in 2019 with no information about when
it will become operational or when trains and drivers will be available
for the 2tph all week service. The next timetable will have no changes,
with just ten trains a day in each direction (peak only) and no weekend
service. Hence the reason why there is only a soft opening of the
station, no grand opening.
++++++++++++

--
Basil Jet recently enjoyed listening to
Andy Partridge - Fuzzy Warbles Volume 1