Thread: Electric Shapps
View Single Post
  #99   Report Post  
Old September 10th 19, 06:51 PM posted to uk.transport.london
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Electric Shapps

In message , at 17:12:04 on Tue,
10 Sep 2019, Theo remarked:
Roland Perry wrote:
Does that include the wiring from the distribution box to the garage?


https://www.edfenergy.com/sites/defa..._point_tcs.pdf

‘Standard Installation’ means an installation that can be carried out at
the Site without any additional site preparation works, man hours or
additional equipment to install the Equipment and shall include, but not be
limited, to the following:
a. fitting of the Equipment on to an internal or
external, existing brick or plaster wall, or to another suitably robust
permanent structure at the Site;
b. up to 10 metres of cable, neatly clipped
to the wall(s) or run in suitable trunking fixed to the wall between the
main electricity distribution board and the Equipment;
c. fitting and testing of electrical connections and protections required;
d. an additional individual consumer unit, if required
e. installation of a Type C MCB or a Type A RCD/RCBO in an enclosure;
f. an earth rod in soft ground, if required;

(that particular instance is GBP299, only selected because it came up
recently on another newsgroup. Others are cheaper)


No good for about half the houses-with-garages I've owned over the
years, then. Only works for an integral garage, not most detached ones.
Not that I've ever used an integral garage to store a car in (rather
than using it as a lockup).
--
Roland Perry