North London Line goes 4-car in early 2011
On Jul 13, 3:57 pm, Charles Ellson wrote:
Any time I have been down that way the non-rush hour loadings of the
tube trains on the DC line hardly seem to exceed about a dozen people
Really IMHO what needs to be done - nay should have been done under
WCML PUG - is abandon the DC out of Euston, convert it to AC and have
a full 6 track railway between Euston and Watford.
--
Nick
|