London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old November 3rd 10, 05:29 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 20
Default Watford to St Albans tram link could open in 2012

Watford to St Albans tram link could open in 2012

From eWatford Observer, 2:14pm Wednesday 3rd November 2010

By Neil Skinner »

Trams could be running regularly between Watford and St Albans by
2012, a new report suggests.
Hertfordshire County Council, which wants to convert the Abbey Flyer
line between Watford Junction and St Albans Abbey to a tram route,
carried out an extensive public consultation earlier this year – the
full findings of which were released by the Department for Transport
(DfT) last week.
The report answers numerous questions posed by potential service users
and describes a clear time-line for the project, which will allow the
running of two trams at half-hourly intervals, instead the current one
every 45 minutes.
HCC, which will be granted ownership of the land by the government,
will sign a 22 year lease agreement with one of four shortlisted
contractors early next year.
If all goes to plan, construction work on a depot and passing loop
will begin late in 2011, with the full tram conversion opening the
following year.
Those passengers who responded to the consultation made several
requests, including upping the frequency of services to three per
hour, increasing passenger capacity at peak times and running services
later into the night.
HCC explained in the document that each was possible and would be
viewed positively if included in the tender document.
Suggestions that the line be extended to include street running in
Watford and St Albans, however, were rejected for the time being.
The council explained that funding was fixed to include only the
immediate conversion project but did not rule out extensions in the
future – should funding become available.
An extension of the line to London Euston, however, has been ruled
out.
………………………………..................
………………………………..................
John Burke
WRUG

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Croxley Rail Link: London Underground could take over construction of £230m project [email protected] London Transport 7 December 19th 14 07:40 PM
Watford to St Albans Tram link to 'go ahead' says MP burkey[_2_] London Transport 6 June 30th 10 01:22 PM
Watford Junction - Shops could be bulldozed for new road burkey[_2_] London Transport 35 July 18th 09 07:36 AM
Brian Hardy talks about Berlin U-Bahn and S-Bahn in St Albans on Thursday John Rowland London Transport 0 November 12th 03 12:41 AM


All times are GMT. The time now is 02:22 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017