Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]()
On 2015\11\01 20:56, Charles Ellson wrote:
On Sun, 01 Nov 2015 10:26:24 +0000, e27002 aurora wrote: On Saturday, October 31, 2015 at 10:09:45 AM UTC, Basil Jet wrote: On 2015\10\30 23:28, Robin9 wrote: I note that there seems to be no provision to create an interchange with the Barking/Gospel Oak service even though the suggested route pretty well passes under South Tottenham station. I assume whoever created this plan is aware that the Overground service is growing fast but needs to provide more opportunities to change to other routes? The Seven Sisters station will have "A new southern ticket hall and entrance onto the High Road/Ermine Road.. A dedicated link between South Tottenham and the new southern ticket hall". But at Tottenham Hale it seems that there will be no interchange with the Goblin, even though a 250m platform would stretch from the current station to the Goblin line, if they built it south of the road instead of north. That would in practice be re/building two new stations not just extending a couple of platforms. Also, the distance from Tottenham Hale to the bridge over GOBLIN is about twice that given above so there would still be a couple of hundred yards for interchanging passengers to walk between platforms extended south from Tottenham Hale to a new station on GOBLIN. You're right, it looks to be about 450 metres. I appear to have measured it rather inaccurately. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail 2 consultation | London Transport | |||
Crossrail 2 - The Hype And The Consultation | London Transport | |||
Crossrail consultation at that church round the back of Centrepoint | London Transport | |||
West London Tram consultation | London Transport |