Default Metropolitan Line to be extended

http://www.railwaygazette.com/news/n...ng-agreed.html

  #2   Report Post  
Old November 23rd 15, 11:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Metropolitan Line to be extended

Offramp wrote:
http://www.railwaygazette.com/news/n...ng-agreed.html


I keep thinking it's all systems go with this long-delayed project, and
then hear there's been yet another final agreement. I wonder how many more
times?

It's amazing that it's taken this long and will cost so much, to build a
short new viaduct and reinstate a mothballed line that's largely intact.

  #3   Report Post  
Old November 24th 15, 02:00 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Metropolitan Line to be extended

On 2015\11\24 00:30, Recliner wrote:
Offramp wrote:
http://www.railwaygazette.com/news/n...ng-agreed.html


I keep thinking it's all systems go with this long-delayed project, and
then hear there's been yet another final agreement. I wonder how many more
times?

It's amazing that it's taken this long and will cost so much, to build a
short new viaduct and reinstate a mothballed line that's largely intact.


Construction of the Metropolitan Railway from Paddington to Farringdon,
cut and cover most of the way, started in March 1860 and it opened to
the public in January 1863. So this construction is planned to take
significantly longer.
  #4   Report Post  
Old November 24th 15, 06:41 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Metropolitan Line to be extended

Basil Jet wrote:
On 2015\11\24 00:30, Recliner wrote:
Offramp wrote:
http://www.railwaygazette.com/news/n...ng-agreed.html


I keep thinking it's all systems go with this long-delayed project, and
then hear there's been yet another final agreement. I wonder how many more
times?

It's amazing that it's taken this long and will cost so much, to build a
short new viaduct and reinstate a mothballed line that's largely intact.


Construction of the Metropolitan Railway from Paddington to Farringdon,
cut and cover most of the way, started in March 1860 and it opened to
the public in January 1863. So this construction is planned to take
significantly longer.


I know, it's crazy that an entirely above-ground short railway, mostly
built on an existing trackbed, is taking longer to (re)build than a complex
cut-and-cover pioneering railway did 150+ years earlier. I think it's also
taken much longer to plan and agree it.
  #5   Report Post  
Old November 24th 15, 12:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 1,139
Default Metropolitan Line to be extended

On Tuesday, 24 November 2015 03:00:45 UTC, Basil Jet wrote:

Construction of the Metropolitan Railway from Paddington to Farringdon,
cut and cover most of the way, started in March 1860 and it opened to
the public in January 1863. So this construction is planned to take
significantly longer.


LOROL! That is pretty funny!


  #6   Report Post  
Old November 24th 15, 08:02 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 351
Default Metropolitan Line to be extended

In article ,
Paul Corfield wrote:
On Tue, 24 Nov 2015 00:30:33 -0000 (UTC), Recliner
wrote:

Offramp wrote:
http://www.railwaygazette.com/news/n...ng-agreed.html


I keep thinking it's all systems go with this long-delayed project, and
then hear there's been yet another final agreement. I wonder how many more
times?

It's amazing that it's taken this long and will cost so much, to build a
short new viaduct and reinstate a mothballed line that's largely intact.


I think we are now done. The latest problem was caused by the
valuation of transferred land from HCC to TfL. TfL, as part of the
transfer arrangements, have reviewed all cost estimates, value of
works done so far plus transferred assets. This meant a hole was
found in the funding package and HCC refused to top up the gap even
though their valuation caused the issue.


This article describes Hertfordshire's GBP 2.73 million wizzard wheeze
of paying for the link with disused trackbed they bought for one pound.
http://www.railtechnologymagazine.com/rail-news/tfl-must-plug-273-croxley-link-shortfall-after-council-offers-1-wasteland

Nick
--
"The Internet, a sort of ersatz counterfeit of real life"
-- Janet Street-Porter, BBC2, 19th March 1996


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Budget 2014: GOBLIN line to be extended Mizter T London Transport 13 March 21st 14 11:53 PM
Extended East London Line opens fully today Mizter T London Transport 82 June 2nd 10 10:06 PM
Extended Circle trial this weekend Paul Scott London Transport 139 July 6th 09 03:45 PM
Bus route 59 extended to link Waterloo and Kings X / St. Pancras Mizter T London Transport 11 November 2nd 07 10:18 PM
Marble Arch car park and the extended C charge zone free route [email protected] London Transport 7 August 28th 06 12:04 PM


All times are GMT. The time now is 09:49 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017