Default Last class 378 goes 5 car

On Wed, 17 Feb 2016 08:37:58 -0000 (UTC)
Recliner wrote:
Basil Jet wrote:
On 2016\02\17 01:39, wrote:
In article ,
() wrote:

In article

-septembe
r.org,
(Recliner) wrote:

wrote:

Reading the rest of the article, it's a pity they don't make use
of the dual system capability to use overhead AC on the Euston
approaches and simplify the layout there by chucking out the DC
electrification when the changes ahead of HS2 are implemented. I
was amazed to see they're keeping the dual voltage tracks through
those changes.

Yes, it is strange. Perhaps there isn't a suitable voltage change point
on the Euston approach?

I note there are tunnels north of Euston which are only
DC-electrified, just before the dual-electrified section starts.
Maybe they are the problem? Can't the 378s switch while on the move?

That's the bored pair of Primrose Hill tunnels. I suppose they are too tight
for 25KV overhead electrification?


The DC service is presumably DC because it shares track with the
Bakerloo, not because of any clearance issues. Did the adjacent tunnels
have to be enlarged for the catenary?


It doesn't share those tunnels with the Bakerloo, and with dual voltage new
trains, one assumes the non-shared LO tracks into Euston could be 25kV.


Why bother switching over to 25Kv for the last mile if there's a perfectly
good 3rd rail that can be used? It just makes the trip operationally more
complex and the AC kit is an extra point of failure.

--
Spud



  #7   Report Post  
Old February 17th 16, 03:44 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Last class 378 goes 5 car

In article , d () wrote:

On Wed, 17 Feb 2016 08:37:58 -0000 (UTC)
Recliner wrote:
Basil Jet wrote:
On 2016\02\17 01:39,
wrote:
In article ,
() wrote:

In article

-septembe
r.org,
(Recliner) wrote:

wrote:

Reading the rest of the article, it's a pity they don't make use
of the dual system capability to use overhead AC on the Euston
approaches and simplify the layout there by chucking out the DC
electrification when the changes ahead of HS2 are implemented. I
was amazed to see they're keeping the dual voltage tracks through
those changes.

Yes, it is strange. Perhaps there isn't a suitable voltage change
point on the Euston approach?

I note there are tunnels north of Euston which are only
DC-electrified, just before the dual-electrified section starts.
Maybe they are the problem? Can't the 378s switch while on the move?

That's the bored pair of Primrose Hill tunnels. I suppose they are too
tight for 25KV overhead electrification?

The DC service is presumably DC because it shares track with the
Bakerloo, not because of any clearance issues. Did the adjacent tunnels
have to be enlarged for the catenary?


It doesn't share those tunnels with the Bakerloo, and with dual voltage
new trains, one assumes the non-shared LO tracks into Euston could be
25kV.


Why bother switching over to 25Kv for the last mile if there's a perfectly
good 3rd rail that can be used? It just makes the trip operationally more
complex and the AC kit is an extra point of failure.


Because having to have two electrification systems in the Euston throat is a
considerable complication, particularly for the signalling. So it's likely
to lead to more failures.

--
Colin Rosenstiel
  #8   Report Post  
Old February 17th 16, 03:49 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default Last class 378 goes 5 car

On Wed, 17 Feb 2016 09:44:42 -0600
wrote:
Because having to have two electrification systems in the Euston throat is a
considerable complication, particularly for the signalling. So it's likely
to lead to more failures.


So is there a high level of signal failures in that area?

--
Spud


  #9   Report Post  
Old February 18th 16, 11:08 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 240
Default Last class 378 goes 5 car

In message , Basil Jet
wrote:
The DC service is presumably DC because it shares track with the
Bakerloo, not because of any clearance issues. Did the adjacent tunnels
have to be enlarged for the catenary?


It was built as a DC route because it shared trains with the Bakerloo,
decades before AC electrification came near Euston.

It is quite possible that, since steam wasn't expected to use the lines,
the tunnels were built to a tighter loading gauge. But I don't have data
conveniently available to me.

(You could do a FoIA request on the clearance.)

--
Clive D.W. Feather | Home:
Mobile: +44 7973 377646 | Web: http://www.davros.org
Please reply to the Reply-To address, which is:


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Last class 378 goes 5 car eastender[_5_] London Transport 2 February 16th 16 11:00 PM
The vocabulary of a Class 378 martin London Transport 3 June 12th 10 07:56 PM
Class 378/2 at Haggerston Dr. Sunil London Transport 5 May 28th 10 03:23 PM
Class 378 in service Paul Corfield London Transport 64 March 16th 10 11:38 AM
New platform markings for class 378 at Shepherd's Bush Andy London Transport 1 June 8th 09 01:57 PM


All times are GMT. The time now is 12:33 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017