Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() Apparently the Euston to Watford line has had 4-car trains ordered. At the moment, UIVMM, it has 5-car trains. Is it going to switch from 3tph to 4tph at the exact same time as the new stock starts? Even so, 15 cars per hour to 16 cars per hour is a very modest increase, especially when the increased frequency will increase usage (mostly at the expense of the Bakerloo). I wonder why they didn't order more of the current trains and run 5 cars at 4tph? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overground stock | London Transport | |||
More sweaty armpits on the new Overground stock | London Transport | |||
Overground new stock | London Transport | |||
TfL / NLL / Metronet surface stock / tube stock / Croxley link | London Transport | |||
1938 Stock on Uxbridge 100 and T Stock? | London Transport |