Default Crossrail 2 hits the buffers

On Wed, 31 May 2017 11:10:10 -0500
wrote:
In article ,
d () wrote:


https://en.wikipedia.org/wiki/File:S...pying_platform
s_21_and_22,_Waterloo_station_in_2015.jpg

Do you not realise that the approach to those platforms was a single track
from and to the Linford St flyover?


Thats south of vauxhall, it has no bearing on the approach to waterloo and it
doesn't take 10 years to fit some points between there and waterloo and in fact
if you look on google maps you'll see plenty connecting the eurostar lines to
the rest of the network.

--
Spud


  #22   Report Post  
Old June 1st 17, 08:49 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2007
Posts: 195
Default Crossrail 2 hits the buffers

On Wednesday, 31 May 2017 12:46:15 UTC+1, wrote:
On Wed, 31 May 2017 04:39:38 -0500
wrote:
You also seem blissfully unaware of the approach track to Waterloo which is
where a lot of the work is needed to allow former International platforms
designed for infrequent arrivals and departures to be used for a frequent
suburban service. You do yourself no favours overlooking such factors.


It didn't take 10 years to build it in the first place so don't tell me its
taken 10 years to figure out how to rejig the track. The only reason its been
sitting idle so long is utter incompetance at Network Rail. And as this photo
proves they could have run trains into it ages ago if they'd wanted to without
having to rebuild the thing:

https://en.wikipedia.org/wiki/File:S...ng_platforms_2
1_and_22,_Waterloo_station_in_2015.jpg


You seem to think that Network Rail had independence to just splash £700m on reopening Waterloo. It didn't. The responsibility for the delay sits with the DfT who sat on their hands for years and did nothing about expanding capacity into Waterloo. It was only the NR / SET alliance that started to push things along in terms of new and longer trains and the associated infrastructure. If the Government don't put requirements in the HLOS / SOFA process then they don't get done. Government have sat back and left the South Western franchise to toddle along for many years despite the fact that there has been very strong growth in demand including heavy weekend loadings and contra peak commuter flows (e.g out towards Brentford and Kew in the AM peak due to the media businesses located there) growing.

The government then killed off the alliance by pulling NR back under DfT direct funding control. They then failed to secure a franchise extension with SWT (suspect both parties were rather awkward to be fair) so the franchise has had to be retendered. Bizarrely the handover occurs slap bang in the middle of the Waterloo blockade this August.

I have also read somewhere else that the flyover near Stewarts Lane that Eurostar used to reach the South Eastern line was funded with EU money. If the tracks to that viaduct are disconnected before a certain point in time then the funding has to be returned to the EU. That may also be a factor in the delay on this scheme. Note this last sentence is speculation on my part before people start frothing at the mouth and blaming Brussels.

--
Paul C
via Google
  #23   Report Post  
Old June 1st 17, 10:12 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2017
Posts: 18
Default Crossrail 2 hits the buffers

In article , d () wrote:

On Wed, 31 May 2017 11:10:10 -0500
wrote:
In article ,
d () wrote:


https://en.wikipedia.org/wiki/File:S...pying_platform
s_21_and_22,_Waterloo_station_in_2015.jpg

Do you not realise that the approach to those platforms was a single
track from and to the Linford St flyover?


Thats south of vauxhall, it has no bearing on the approach to
waterloo and it doesn't take 10 years to fit some points between
there and waterloo and in fact
if you look on google maps you'll see plenty connecting the eurostar
lines to the rest of the network.


Yes, the single line runs through platform 1 at Vauxhall.

--
Colin Rosenstiel
  #24   Report Post  
Old June 1st 17, 10:44 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default Crossrail 2 hits the buffers

On Thu, 1 Jun 2017 01:49:09 -0700 (PDT)
Paul Corfield wrote:
You seem to think that Network Rail had independence to just splash =C2=A37=
00m on reopening Waterloo. It didn't. The responsibility for the delay si=


The points to NR exist, the platforms were perfectly servicable until they
started to demolish part them (for whatever reason, another excuse to waste
more taxpayers money) and train information boards were already fitted so apart
from putting in some standard ticket gates what exactly needed to be done to
"reopen" these platforms and use them? Answer - absolutely **** all. It was
just incompetance and indifference all round.

--
Spud

  #25   Report Post  
Old June 1st 17, 03:11 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail 2 hits the buffers

wrote:
On Thu, 1 Jun 2017 01:49:09 -0700 (PDT)
Paul Corfield wrote:
You seem to think that Network Rail had independence to just splash =C2=A37=
00m on reopening Waterloo. It didn't. The responsibility for the delay si=


The points to NR exist, the platforms were perfectly servicable until they
started to demolish part them (for whatever reason, another excuse to waste
more taxpayers money) and train information boards were already fitted so apart
from putting in some standard ticket gates what exactly needed to be done to
"reopen" these platforms and use them? Answer - absolutely **** all. It was
just incompetance and indifference all round.


As usual, your ignorance is causing you to grossly oversimplify things.



  #26   Report Post  
Old June 1st 17, 03:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default Crossrail 2 hits the buffers

On Thu, 1 Jun 2017 15:11:16 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 1 Jun 2017 01:49:09 -0700 (PDT)
Paul Corfield wrote:
You seem to think that Network Rail had independence to just splash =C2=A37=
00m on reopening Waterloo. It didn't. The responsibility for the delay si=


The points to NR exist, the platforms were perfectly servicable until they
started to demolish part them (for whatever reason, another excuse to waste
more taxpayers money) and train information boards were already fitted so

apart
from putting in some standard ticket gates what exactly needed to be done to
"reopen" these platforms and use them? Answer - absolutely **** all. It was
just incompetance and indifference all round.


As usual, your ignorance is causing you to grossly oversimplify things.


The infrastructure was in in place. Anything else is down to people.

--
Spud

  #27   Report Post  
Old June 1st 17, 07:21 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail 2 hits the buffers

wrote:
On Thu, 1 Jun 2017 15:11:16 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 1 Jun 2017 01:49:09 -0700 (PDT)
Paul Corfield wrote:
You seem to think that Network Rail had independence to just splash =C2=A37=
00m on reopening Waterloo. It didn't. The responsibility for the delay si=

The points to NR exist, the platforms were perfectly servicable until they
started to demolish part them (for whatever reason, another excuse to waste
more taxpayers money) and train information boards were already fitted so

apart
from putting in some standard ticket gates what exactly needed to be done to
"reopen" these platforms and use them? Answer - absolutely **** all. It was
just incompetance and indifference all round.


As usual, your ignorance is causing you to grossly oversimplify things.


The infrastructure was in in place. Anything else is down to people.


No it wasn't. Take a look at what they're having to do in Waterloo:
https://www.flickr.com/photos/reclin...57673819851723

  #28   Report Post  
Old June 2nd 17, 01:33 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2013
Posts: 704
Default Crossrail 2 hits the buffers

On Thu, 1 Jun 2017 19:21:16 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 1 Jun 2017 15:11:16 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 1 Jun 2017 01:49:09 -0700 (PDT)
Paul Corfield wrote:
You seem to think that Network Rail had independence to just splash

=C2=A37=
00m on reopening Waterloo. It didn't. The responsibility for the delay

si=

The points to NR exist, the platforms were perfectly servicable until they
started to demolish part them (for whatever reason, another excuse to waste
more taxpayers money) and train information boards were already fitted so
apart
from putting in some standard ticket gates what exactly needed to be done

to
"reopen" these platforms and use them? Answer - absolutely **** all. It

was
just incompetance and indifference all round.

As usual, your ignorance is causing you to grossly oversimplify things.


The infrastructure was in in place. Anything else is down to people.


No it wasn't. Take a look at what they're having to do in Waterloo:
https://www.flickr.com/photos/reclin...57673819851723


Yes I know they're doing all that, I work nearby. However given local
services have run from those platforms on rare occasions these works are
clearly a long way from being essential. As I said, the infrastructure was
there and the delay was down to people in charge being dicks.

--
Spud

  #29   Report Post  
Old June 2nd 17, 02:59 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail 2 hits the buffers

In message , at 13:33:11 on Fri, 2 Jun
2017, d remarked:

As I said, the infrastructure was there and the delay was down to
people in charge being dicks.


Not bobs?

https://www.youtube.com/watch?v=FU-tuY0Z7nQ
--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bus hits tree Boltar London Transport 35 May 21st 08 05:53 PM
Croxley Rail Link hits the sidings [email protected] London Transport 61 April 8th 08 03:21 PM
Congestion charging hits the rails Rupert Candy London Transport 8 June 23rd 05 08:56 PM
South Ken redevelopment hits buffers Dave Arquati London Transport 3 September 12th 04 04:22 AM
Tall ship hits Tower Bridge Richard J. London Transport 22 May 18th 04 12:57 AM


All times are GMT. The time now is 05:12 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017