London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old December 7th 17, 09:39 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2017
Posts: 329
Default Overhead wire in moorgate line stations

Anyone know why there's an overhead wire on the southbound of highbury station
(and maybe others, I didn't check) on the moorgate line? Its obviously not some
old catenary since the line was always 3rd/4th rail and its only hung from the
ceiling by some thin wires anyway. Is it in case a pan is left up at Drayton?


  #2   Report Post  
Old December 7th 17, 12:43 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 1,139
Default Overhead wire in moorgate line stations

I do not know. But this is one of those things where I immediately think, I've got to go and see it. I'VE GOT TO GO AND SEE IT!
  #5   Report Post  
Old December 8th 17, 09:48 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2011
Posts: 329
Default Overhead wire in moorgate line stations

On 07/12/2017 21:31, wrote:
In article ,
() wrote:

Anyone know why there's an overhead wire on the southbound of
highbury station (and maybe others, I didn't check) on the moorgate
line? Its obviously not some
old catenary since the line was always 3rd/4th rail and its only hung
from the ceiling by some thin wires anyway. Is it in case a pan is
left up at Drayton?


Whole platform length or just a short section?

https://commons.wikimedia.org/wiki/F...look_north.JPG
--
Robin
reply-to address is (intended to be) valid


  #7   Report Post  
Old December 11th 17, 09:36 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2017
Posts: 329
Default Overhead wire in moorgate line stations

On Sun, 10 Dec 2017 15:57:32 +0000
Adrian Caspersz wrote:
On 08/12/17 10:48, Robin wrote:
On 07/12/2017 21:31, wrote:
In article ,
() wrote:

Anyone know why there's an overhead wire on the southbound of
highbury station (and maybe others, I didn't check) on the moorgate
line? Its obviously not some
old catenary since the line was always 3rd/4th rail and its only hung
from the ceiling by some thin wires anyway. Is it in case a pan is
left up at Drayton?

Whole platform length or just a short section?


https://commons.wikimedia.org/wiki/F...n_Great_Northe
n_southbound_look_north.JPG


CBTC radio?

https://en.wikipedia.org/wiki/Commun..._train_control

http://www.railjournal.com/index.php...eps-up-victori
-line-frequency.html


Only if they're using long wave!

  #10   Report Post  
Old December 18th 17, 01:27 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,484
Default Overhead wire in moorgate line stations

On 18.12.17 10:10, wrote:
On Sat, 16 Dec 2017 23:44:02 +0000
"Clive D.W. Feather" wrote:
In article ,
writes
Anyone know why there's an overhead wire on the southbound of highbury

station
(and maybe others, I didn't check) on the moorgate line? Its obviously not

some
old catenary since the line was always 3rd/4th rail and its only hung from

the
ceiling by some thin wires anyway. Is it in case a pan is left up at Drayton?


I believe that's the case, yes; it's not powered, it's just to stop the
pan disassembing itself on the tunnel roof. I've a vague memory that it
was put in when the line was handed over to BR.


That seemed the most likely scenario to me. Wonder how often the pan gets
left up on that line? Must happen occasionally.

Is there nothing that will force a pan drop?

One Metro-North, for example, the M2 runs dual-mode DC on 3rd rail and
AC under the wire. I assume that the same happens with the newer M8.

As soon as that train's shoes come into contact with live 3rd rail, the
pantographs automatically come down. The train will not take power,
however, until the engineer sets the power mode switch to the proper
setting.

The engineer will normally set the mode switch to DC, which also drops
the pans, though I have at times seen them coast into 3rd rail with the
pans up, and then only switch the power made when the train is out of
the wire.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Changing from NR to Northern Line at Moorgate Tristán White London Transport 10 September 21st 11 06:35 AM
City Thameslink overhead wires martin j London Transport 12 October 3rd 09 09:48 PM
A Moorgate to London Bridge Tunnel (Old chestnut) Jim Brown London Transport 65 October 15th 04 09:20 PM
Moorgate - Closed to WAGN for 1 year Morton London Transport 12 September 26th 04 10:57 PM
Trains to Moorgate now go via Liverpool Street John London Transport 3 November 24th 03 01:30 PM


All times are GMT. The time now is 07:45 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017