Default Disused platform at South Ken to reopen in 2019


https://www.ianvisits.co.uk/blog/201...ation-upgrade/

  #2   Report Post  
Old February 19th 18, 01:55 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Disused platform at South Ken to reopen in 2019

On Mon, 19 Feb 2018 13:26:46 +0000, Basil Jet
wrote:

https://www.ianvisits.co.uk/blog/201...ation-upgrade/


Thanks for posting that. I hope this time, the scheme does go through.
Ironically, I think both the Picc platforms had step-free access in
their original 1906 version, before the 1970s escalators replaced the
old lifts. And the sub-surface lines had a total of six platforms
until 1957. So the mid/late 20th century 'improvements' in some ways
made the station worse, with less capacity.
  #3   Report Post  
Old February 19th 18, 04:23 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Disused platform at South Ken to reopen in 2019

In article ,
(Recliner) wrote:

On Mon, 19 Feb 2018 13:26:46 +0000, Basil Jet
wrote:


https://www.ianvisits.co.uk/blog/201...-south-kensing
ton-tube-station-upgrade/

Thanks for posting that. I hope this time, the scheme does go through.
Ironically, I think both the Picc platforms had step-free access in
their original 1906 version, before the 1970s escalators replaced the
old lifts. And the sub-surface lines had a total of six platforms
until 1957. So the mid/late 20th century 'improvements' in some ways
made the station worse, with less capacity.


The 6 surface lines platforms included 2 bays whose regular passenger use
ceased some time before 1957. I remember the south side east-facing bay only
being used to stable a train on Sundays when I was a child. That was before
the escalator shaft was built through the platform serving that bay and the
westbound District line too. So that's 2 platforms that can't be restored.
The Metropolitan west-facing bay is where the stairs to the Piccadilly
access were built UIVMM, so only the north originally Metropolitan platform
can be restored to use. The article wasn't crystal clear but I guess the
plan is for all eastbound trains to use it with the island only using its
south face in future. That does make me wonder how interchange with the
Piccadilly Line will be arranged to the new platform.

--
Colin Rosenstiel
  #4   Report Post  
Old February 19th 18, 04:41 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Disused platform at South Ken to reopen in 2019

wrote:
In article ,
(Recliner) wrote:

On Mon, 19 Feb 2018 13:26:46 +0000, Basil Jet
wrote:


https://www.ianvisits.co.uk/blog/201...-south-kensing
ton-tube-station-upgrade/

Thanks for posting that. I hope this time, the scheme does go through.
Ironically, I think both the Picc platforms had step-free access in
their original 1906 version, before the 1970s escalators replaced the
old lifts. And the sub-surface lines had a total of six platforms
until 1957. So the mid/late 20th century 'improvements' in some ways
made the station worse, with less capacity.


The 6 surface lines platforms included 2 bays whose regular passenger use
ceased some time before 1957. I remember the south side east-facing bay only
being used to stable a train on Sundays when I was a child. That was before
the escalator shaft was built through the platform serving that bay and the
westbound District line too. So that's 2 platforms that can't be restored.
The Metropolitan west-facing bay is where the stairs to the Piccadilly
access were built UIVMM, so only the north originally Metropolitan platform
can be restored to use. The article wasn't crystal clear but I guess the
plan is for all eastbound trains to use it with the island only using its
south face in future.


Yes, that's how I read it, too.

That does make me wonder how interchange with the
Piccadilly Line will be arranged to the new platform.


I assume the current underground link corridor would be extended north,
with new stairs to the widened, restored northern platform. So the route
from the Picc would first pass the stairs to the now westbound-only
District platform, and then the new stairs to the restored eastbound
platform.




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Completion of London's Thameslink rail project delayed untilDecember 2019 David Walters London Transport 14 November 25th 17 05:00 PM
London Bridge platforms 14-15 reopen Recliner[_2_] London Transport 2 April 1st 14 02:16 AM
Hammersmith Flyover to reopen to light traffic - BBC News Bruce[_2_] London Transport 19 January 15th 12 06:14 PM
Claphan Junction Disused platform 1 Mystery Flyer London Transport 44 July 2nd 07 07:46 PM
ROLL (Reopen Lea Valley Line) meeting John Rowland London Transport 1 February 12th 04 08:18 PM


All times are GMT. The time now is 10:58 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017