On 5 Jul 2018 16:11:54 GMT
Jeremy Double wrote:
wrote:
On 05/07/2018 14:50, Jim Chisholm wrote:
On 05/07/2018 11:28, Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul
2018, Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.
Of course it could be a rat (probably fried)
&
I bet a lot of equipment cabinets are not designed to dissipate the sort
of heat* we currently have. I remember building simple circuits and
seeing how tolerant they were to both low and high temperatures as they
were to be in a field.


I wonder how often failures like this occur in India due to heat?

We do have hot summers and cold winters -- perhaps not to the same
degree and length, respectively, as India and Russia, but nonetheless we
are hit with weather extremes.


The annual temperature ranges in the UK are nowhere near as large as in
(say) Siberia or Chicago. The UK has a maritime climate, which means a
relatively small variation from winter to summer.


I think its fair to say the climate has changed in the last couple of
decades and the changes are becoming more pronounced. One can argue the
toss over whether its man made or natural, but either way equipment needs
to be made resilient against this whether than involved upgrading installed
equipment or replacing it with new kit.


  #14   Report Post  
Old July 5th 18, 06:32 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2018
Posts: 7
Default Signal failure at Victoria

On 05/07/18 17:28, Jim Chisholm wrote:
On 05/07/2018 17:11, Jeremy Double wrote:
wrote:
On 05/07/2018 14:50, Jim Chisholm wrote:
On 05/07/2018 11:28, Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul
2018, Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.
Of course it could be a rat (probably fried)
&
I bet a lot of equipment cabinets are not designed to dissipate the
sort
of heat* we currently have. I remember building simple circuits and
seeing how tolerant they were to both low and high temperatures as they
were to be in a field.

I wonder how often failures like this occur in India due to heat?

We do have hot summers and cold winters -- perhaps not to the same
degree and length, respectively, as India and Russia, but nonetheless we
are hit with weather extremes.


The annual temperature ranges in the UK are nowhere near as large as in
(say) Siberia or Chicago.* The UK has a maritime climate, which means a
relatively small variation from winter to summer.

That means it is not (normally) economical viable to 'design' for
extreme temperatures. We didn't used to point heaters or paint them
white! I don't know if I dare mention Climate (variation).

The extreme temperatures will produce faults in equipment designed for
such temperatures but still capable of operating quite satisfactorily
the rest of the time.
  #15   Report Post  
Old July 5th 18, 09:10 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 164
Default Signal failure at Victoria

On 05/07/2018 12:08, Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul 2018, Graeme Wall remarked:
Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415


It just did:

11:23
Disruption expected until 7am tomorrow

National Rail has now said disruption will continue until at least 7am tomorrow morning (Friday, July 6).


I can see why the Thameslink services on the Sutton-Wimbledon loop are affected, as well as others that use that part of the system. But this morning at least the Bedford-Brighton/Gatwick trains appeared to be getting through more or less on-time as presumably the route from Blackfriars to London Bridge and then East Croydon wasn't affected at all. So two questions to which I can't find an answer:

(1) Why didn't they tell people who couldn't get trains from Victoria to Gatwick or Brighton just to take the circle line a few stops to Blackfriars and get on a working Thameslink train?

(2) Why has the Thameslink service gone tits-up this evening - I see a gap of more than 2 hours between successive northbound trains to Bedford. There seems no obvious reason.


--
Clive Page


  #16   Report Post  
Old July 6th 18, 09:45 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2013
Posts: 166
Default Signal failure at Victoria

" Wrote in message:
On 05/07/2018 14:50, Jim Chisholm wrote:
On 05/07/2018 11:28, Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul
2018, Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.

Of course it could be a rat (probably fried)
&
I bet a lot of equipment cabinets are not designed to dissipate the sort
of heat we currently have. I remember building simple circuits and
seeing how tolerant they were to both low and high temperatures as they
were to be in a field.


I wonder how often failures like this occur in India due to heat?

We do have hot summers and cold winters -- perhaps not to the same
degree and length, respectively, as India and Russia, but nonetheless we
are hit with weather extremes.


The 'normal' annual range here is about 60c, from lows at around -20c in winter to highs of around 40c in summer. A couple of years ago we had an absolute stinker of a winter and they recorded a low of -33 in Brasov; last summer it was crazy hot, notable not so much for the temperature ( 40c, but that's to be expected at least a day or two every year) but that it was that easy for days at a time. Somewhat concerned this year could be a repeat - when I left the house at 9.30 this morning it was already north of 31c by the weather station on my balcony :-).

Our datacentre has never had a cooling related outage ;-). Actually, thinking about it, it's never had an outage at all.


I am reminded though of a monumental cluster**** that happened to the Netherlands (Schipol) datacentre of a certain large satellite broadcaster while I was working there... Power was lost, so the generators kicked in and everything worked smoothly as planned. Until one of the power control units gave up in a shower of sparks. No problem, the backup was ok... Until 5 minutes later it did exactly the same thing. And the whole datacentre was down...

Root cause was sort-of aircon. The UPS+Power control kit was in shipping containers outside the datacentre, with their own cooling system. At some point this cooling system had failed, and an on-site genius had solved the problem by propping the doors of the containers open and letting fresh air do the job. This worked well enough that evidently nobody ever got round to fixing the aircon...

The problem wasn't that the power control units overheated. It was that moist (salty, being right next to the North Sea) spray/moisture had been getting into to the power control unit all the time those doors had been propped open, corroding the circuit boards, and leading to both units failing identically one after the other...






--



  #17   Report Post  
Old July 6th 18, 11:39 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Signal failure at Victoria

Roland Perry wrote:
In message , at 11:50:20 on Thu, 5 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul 2018,
Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.

It's extremely unlikely that Network Rail has experienced the
simultaneous failure of three separate incoming grid feeds, nor would it
take all day to get just one of them re-instated.

This sounds like the *Network Rail* equipment which merges the three
feeds into the supply to the signalling centre has gone up in smoke.

Any other electricity supply issues reported overnight in Stretham?


Presumably you’re referring to the tweet referenced in that article
“Passengers are advised not to travel from the South into London this
morning due to total loss of signalling power that Network Rail has
experienced on 3 separate supplies in Streatham area.”? I see no
suggestion that it’s external rather than railway-internal power supplies
which have failed.


It's one signalling centre which is without power, thus the "three
supplies" must be those for that centre.

Here's another report from Network Rail (via Simon Calder):

"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

Note, not three generators, one for each of hypothetically three
separate sites.


Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


Anna Noyd-Dryver

  #18   Report Post  
Old July 6th 18, 12:36 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Signal failure at Victoria

In message , at 11:39:51 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 11:50:20 on Thu, 5 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul 2018,
Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.

It's extremely unlikely that Network Rail has experienced the
simultaneous failure of three separate incoming grid feeds, nor would it
take all day to get just one of them re-instated.

This sounds like the *Network Rail* equipment which merges the three
feeds into the supply to the signalling centre has gone up in smoke.

Any other electricity supply issues reported overnight in Stretham?


Presumably you’re referring to the tweet referenced in that article
“Passengers are advised not to travel from the South into London this
morning due to total loss of signalling power that Network Rail has
experienced on 3 separate supplies in Streatham area.”? I see no
suggestion that it’s external rather than railway-internal power supplies
which have failed.


It's one signalling centre which is without power, thus the "three
supplies" must be those for that centre.

Here's another report from Network Rail (via Simon Calder):

"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

Note, not three generators, one for each of hypothetically three
separate sites.


Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


That confirms everything I was saying about the cause, thanks.

It appears to differ from Network Rail's originally announced quick-fix
of generators, unless that's what they used ahead of working out it was
safe to hard-wire one of the two remaining grid feeds.

Thus they still have quite a big project ahead of them - reinstating the
three-way failover equipment (as well as the grid having to make 3/3
rather than 2/3 of the supplies operational).
--
Roland Perry
  #19   Report Post  
Old July 6th 18, 01:01 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Signal failure at Victoria

Roland Perry wrote:
In message , at 11:39:51 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 11:50:20 on Thu, 5 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 09:58:26 on Thu, 5 Jul 2018,
Graeme Wall remarked:

Just when you thought it couldn't get any worse…

https://www.bbc.co.uk/news/uk-england-london-44721415

I smell a rat.

It's extremely unlikely that Network Rail has experienced the
simultaneous failure of three separate incoming grid feeds, nor would it
take all day to get just one of them re-instated.

This sounds like the *Network Rail* equipment which merges the three
feeds into the supply to the signalling centre has gone up in smoke.

Any other electricity supply issues reported overnight in Stretham?


Presumably you’re referring to the tweet referenced in that article
“Passengers are advised not to travel from the South into London this
morning due to total loss of signalling power that Network Rail has
experienced on 3 separate supplies in Streatham area.”? I see no
suggestion that it’s external rather than railway-internal power supplies
which have failed.

It's one signalling centre which is without power, thus the "three
supplies" must be those for that centre.

Here's another report from Network Rail (via Simon Calder):

"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

Note, not three generators, one for each of hypothetically three
separate sites.


Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


That confirms everything I was saying about the cause, thanks.

It appears to differ from Network Rail's originally announced quick-fix
of generators, unless that's what they used ahead of working out it was
safe to hard-wire one of the two remaining grid feeds.

Thus they still have quite a big project ahead of them - reinstating the
three-way failover equipment (as well as the grid having to make 3/3
rather than 2/3 of the supplies operational).


It also confirms that it’s local equipment, not at the signalling centre
itself.


Anna Noyd-Dryver

  #20   Report Post  
Old July 6th 18, 02:00 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Signal failure at Victoria

In message , at 13:01:35 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.


I wonder what it was - they'd have pretty quickly been able to eliminate
back-hoes, smoking substations, and National Grid technicians with
finger trouble.

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


That confirms everything I was saying about the cause, thanks.

It appears to differ from Network Rail's originally announced quick-fix
of generators, unless that's what they used ahead of working out it was
safe to hard-wire one of the two remaining grid feeds.

Thus they still have quite a big project ahead of them - reinstating the
three-way failover equipment (as well as the grid having to make 3/3
rather than 2/3 of the supplies operational).


It also confirms that it’s local equipment, not at the signalling centre
itself.


"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

So it's just a co-incidence that the signalling centre still had power,
yet they needed to locate a generator there to re-energise the local
equipment?
--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Signal Failure john amber London Transport 11 February 28th 11 08:07 PM
Piccadilly line signal failure [email protected] London Transport 21 February 24th 09 10:23 AM
Signal failure on the central line? [email protected] London Transport 10 February 8th 09 11:54 AM
How can you have a signal failure on an ATO system? Boltar London Transport 20 September 5th 07 05:48 AM
Why can't LU cope with a signal failure? Boltar London Transport 51 June 9th 05 07:47 PM


All times are GMT. The time now is 03:50 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright 2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017