Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?



--
Basil Jet - Current favourite song...
Spratleys Japs - Hands (Marc Riley session)
https://www.youtube.com/watch?v=PTFmVrE1WAc

  #2   Report Post  
Old April 8th 19, 07:40 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Tottenham Hale NR

In message , at 20:28:27 on Sun, 7 Apr 2019,
Basil Jet remarked:
Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?


Wouldn't OHL be an active provision, rather than the passive provision
of a trackbed?
--
Roland Perry
  #3   Report Post  
Old April 8th 19, 09:55 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Tottenham Hale NR

Roland Perry wrote:
In message , at 20:28:27 on Sun, 7 Apr 2019,
Basil Jet remarked:
Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?


Wouldn't OHL be an active provision, rather than the passive provision
of a trackbed?


Passive provision for the fourth track would include not building OLÉ masts
where you want to put that fourth track; little if any extra cost now, for
a huge saving if/when that fourth track is required.


Anna Noyd-Dryver

  #4   Report Post  
Old April 8th 19, 10:26 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Tottenham Hale NR

In message , at 08:55:59 on Mon, 8 Apr 2019,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 20:28:27 on Sun, 7 Apr 2019,
Basil Jet remarked:
Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?


Wouldn't OHL be an active provision, rather than the passive provision
of a trackbed?


Passive provision for the fourth track would include not building OLÉ masts
where you want to put that fourth track; little if any extra cost now, for
a huge saving if/when that fourth track is required.


Ok, so what's the answer?

No passive provision required, passive protection botched, or passive
possession not botched as much as the OP claims?
--
Roland Perry
  #5   Report Post  
Old May 29th 19, 07:38 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Tottenham Hale NR

On 07/04/2019 20:28, Basil Jet wrote:

Viewed from the road bridge, it looks as if the electrification masts
for the new third track foul where the fourth track would go. I thought
all of the present work was supposed to allow passive provision for
Crossrail 2?


I've found an answer to this at
https://www.ianvisits.co.uk/blog/201...-close-in-may/

++++++++++++
First of all, Network Rail heavily value engineered the route,
destroying any passive provision there would have been, see my FOI on
this:
https://www.whatdotheyknow.com/reque...engineering_ex

Furthermore, even the previous planning documents prior to the value
engineering conceded that track would have to be re-laid for quad
tracking. This means demolition of signalling and overhead wires and a
long period when Northumberland Park and Meridian Water will be closed
during that period of reconstruction. Clearly a lack of joint up
thinking, forward planning and accountability from Network Rail, are we
surprised?

Secondly, whilst the new station is opening, Abellio Greater Anglia
confirmed at the recent stakeholder meeting that the third track is not
ready and will not be operational in 2019 with no information about when
it will become operational or when trains and drivers will be available
for the 2tph all week service. The next timetable will have no changes,
with just ten trains a day in each direction (peak only) and no weekend
service. Hence the reason why there is only a soft opening of the
station, no grand opening.
++++++++++++

--
Basil Jet recently enjoyed listening to
Andy Partridge - Fuzzy Warbles Volume 1


  #6   Report Post  
Old June 4th 19, 10:09 AM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

I was at Tottenham Hale yesterday. Most of the new Platform 2
is open. At the country end it makes a conventional island platform
with 3; in other words the surface is level. At the London end,
Platform 2 is lower than Platform 3 and a barrier has been installed
to prevent people tripping over.

The new footbridge is open but neither the lifts nor the escalators
are working yet. The second gateway on Platform 4 is functioning
now.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tottenham Hale Bus Station Paul London Transport 7 April 17th 10 09:07 AM
Tottenham Hale Phil Richards London Transport 7 September 15th 09 02:06 AM
Tottenham Hale Bus Station Paul London Transport 32 July 11th 09 05:18 PM


All times are GMT. The time now is 08:22 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017