Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On Sun, 23 Jun 2019 10:22:58 +0100, Roland Perry
wrote: In message , at 09:02:34 on Sat, 22 Jun 2019, Clive D.W. Feather remarked: In article , Roland Perry writes Today I had the [dis]pleasure of driving the Girton to Milton section again, and it's not noticeably further on than six months ago. Lots of weaving contra-flow lanes, single in places, through traffic down to 30mph, and masses of work to do to even restore the original alignment - let alone switch people from one free-flowing dual carriageway to another with a set of overnight 'points'. That's a completely different situation. From Histon to Milton they're widening from 2+2 to 3+3 on the same alignment in a narrow space. It's not surprising that they need to narrow the lanes and have disruption. I have no idea what is going on between Girton and Histon and nobody seems to be able to tell me. We went through years of chaos while they widened it from 2+2 to 3+3 *before* the A14 work started. So I can't see what needs to be done now. The 'new' disruption is indeed very disappointing, especially as there's not much happening on a day to day basis. Must be something to do with building the new intersection at Histon. As for the Girton interchange itself, given how much is being altered it's not surprising. None of this is remotely similar to a new alignment being built out of the way and connected up when ready. On the contrary, the majority of the new Girton interchange is being built "out of the way", but they are making no attempt whatsoever to get it finished first, with the existing roads operating normally, and then "throwing the points" in the manner that's been advocated for the M25. It's quite clear they simply don't care how much they disrupt the traffic, for years on end. That probably wouldn't be a permitted option with the M25 at Heathrow. Exactly the same happened at the new A14/M1 junction, which they again did incrementally with several years of disruption, when the new east-west route was a completely new alignment. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Heathrow Garden City and railway plan | London Transport | |||
Strike contingency plan Walthamstow to Heathrow | London Transport | |||
Cunning Plan-Congestion Charge at Heathrow - Mike Clasper BAA Chief Executive | London Transport | |||
Livingstone's latest wheeze | London Transport | |||
Latest official Crossrail Line Diagram | London Transport |