Default GOBLIN derailment: RAIB investigation

Unsuprisingly, the RAIB will be investigating the derailment
on the GOBLIN. I don't think the annoucment says anything
new, but it's he

https://www.gov.uk/government/news/f...-wanstead-park

Cheers,
Mike

--
Mike Bristow


  #2   Report Post  
Old February 8th 20, 10:12 AM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.
  #3   Report Post  
Old February 8th 20, 12:00 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default GOBLIN derailment: RAIB investigation

In message , at 11:12:04 on Sat, 8
Feb 2020, Robin9 remarked:
About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.


We certainly can't wait for the RAIB report, because that takes
typically 8-12 months.
--
Roland Perry
  #4   Report Post  
Old February 8th 20, 02:37 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2019
Posts: 895
Default GOBLIN derailment: RAIB investigation

On Sat, 8 Feb 2020 13:00:54 +0000, Roland Perry
wrote:

In message , at 11:12:04 on Sat, 8
Feb 2020, Robin9 remarked:
About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.


We certainly can't wait for the RAIB report, because that takes
typically 8-12 months.


Yes, but how long did they take to inspect the site before turning it
over to the gangs to remove all the track, and with it, the evidence?
  #5   Report Post  
Old February 8th 20, 03:12 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default GOBLIN derailment: RAIB investigation

In message , at 15:37:35 on
Sat, 8 Feb 2020, Recliner remarked:

About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.


We certainly can't wait for the RAIB report, because that takes
typically 8-12 months.


Yes, but how long did they take to inspect the site before turning it
over to the gangs to remove all the track, and with it, the evidence?


That's something we rarely get a metric for.
--
Roland Perry


  #6   Report Post  
Old February 11th 20, 12:37 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 464
Default GOBLIN derailment: RAIB investigation

In article ,
Roland Perry wrote:
In message , at 15:37:35 on
Sat, 8 Feb 2020, Recliner remarked:

About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.

We certainly can't wait for the RAIB report, because that takes
typically 8-12 months.


Yes, but how long did they take to inspect the site before turning it
over to the gangs to remove all the track, and with it, the evidence?


Given that repair is going take ~3 weeks (is there an ETA yet?),
and work has been going on for most of that time, I'm not sure it
matters if it took them a few hours or a few days; it's not going
to be a big impact either way.

That's something we rarely get a metric for.


True. It would be interesting to see how quickly the RAIB hand
back the infrastructure to NR, and how quickly NR can reinstate
services; I think here it might make at most a 5% difference but
other instances might be more significant.

--
Mike Bristow
  #7   Report Post  
Old February 11th 20, 01:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default GOBLIN derailment: RAIB investigation

In message , at 13:37:54 on Tue,
11 Feb 2020, Mike Bristow remarked:
In article ,
Roland Perry wrote:
In message , at 15:37:35 on
Sat, 8 Feb 2020, Recliner remarked:

About a week ago, a staff member at Leyton Midland Road Station
told me all the track between Wanstead Park and Walthamstow
Queens Road is going to be replaced. They have obviously already
started because yesterday I saw track working equipment on the
railway bridge over Hainault Road.

Although investigating how this occurred is necessary, my main
concern at present is to get the line repaired and re-opened.

We certainly can't wait for the RAIB report, because that takes
typically 8-12 months.

Yes, but how long did they take to inspect the site before turning it
over to the gangs to remove all the track, and with it, the evidence?


Given that repair is going take ~3 weeks (is there an ETA yet?),
and work has been going on for most of that time, I'm not sure it
matters if it took them a few hours or a few days; it's not going
to be a big impact either way.

That's something we rarely get a metric for.


True. It would be interesting to see how quickly the RAIB hand
back the infrastructure to NR,


They most have done that by now. FOI request, perhaps?

and how quickly NR can reinstate
services; I think here it might make at most a 5% difference but
other instances might be more significant.


--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 Mizter T London Transport 3 August 5th 11 03:49 PM
Tfl Formal Investigation Reports Mizter T London Transport 2 January 12th 11 09:51 PM
RAIB Report into DLR Derailment at Last MIG London Transport 9 June 23rd 09 02:43 PM
DLR Derailment Vehicle Back, no RAIB Report MIG London Transport 3 April 23rd 09 12:06 AM
HSE statement: Buncefield Oil Depot investigation GMails London Transport 0 December 16th 05 03:27 PM


All times are GMT. The time now is 07:22 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017