London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old October 27th 04, 02:12 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2004
Posts: 45
Default Bakerloo Line

How does the Bakerloo line manage with Stonebridge Park depot being on
the wrong side of the line closure at Willesden Junc?

Kevin

  #4   Report Post  
Old October 28th 04, 10:30 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 856
Default Bakerloo Line

In article , TheOneKEA
writes
ISTR that Bakerloo services south of Queen's Park tend to require
approx. 30 trains in the peaks.

Clive Feather would know for sure.


Actually it's not the sort of thing I keep a record of.

The numbers should be in Underground News, and I know at least one
person reading this group keeps all his copies.

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
  #5   Report Post  
Old October 29th 04, 04:59 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 9
Default Bakerloo Line


"Kevin" wrote in message
om...
How does the Bakerloo line manage with Stonebridge Park depot being on
the wrong side of the line closure at Willesden Junc?

Kevin


The Bakerloo has a maximum of 20 trains in service instead of 31 for the
whole line,
with trains running a reduced 5 minute service (4mins Peaks). Stepping back
of
train ops is taking place at both ends of the line during peaks with trains
reversing
via the north sheds at QPK with an operator at each end to reduce turn
around times
2 trains are outstabled at Ruislip Depot for any major failure changeovers.
Only 1 path
eachway per day is given but these havent been used as to my knowledge yet.
Both trains are due to return Mon 1st Nov at the following times

781 782
Ruislip Depot 0519 0536
Ruislip Stn 0539 0555
Rayners Lane 0545 0601
Harrow On The Hill 0550 0607
Neasden (pfm 3) 0558 0616
Finchley Road 0607 0625
Baker Street 0614 0632

An Extra train is kept also at QPK and it can be seen during the day from
the North Pfm
1 on 24 road in the North Sheds
A maximum of 10 could be stabled at QPK (including using both pfms). During
the works
8 are Plus the spare. Capacity at Elephant & Castle is 4 (2pfm 2sidings). 3
are at the mo. And 9 are being
stabled at London Road. Plus another spare.

Colin





Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster Pre-Pay on Bakerloo line Stevie London Transport 2 January 6th 05 05:51 PM
Bakerloo Line Extension Bored Of The Rings London Transport 28 November 4th 04 10:04 AM
Bakerloo Line Joe London Transport 1 September 2nd 04 03:19 PM
Bakerloo Line Annabel Smyth London Transport 25 June 14th 04 08:53 AM
Live ETA on Bakerloo Line Jaime London Transport 20 February 21st 04 04:31 PM


All times are GMT. The time now is 04:31 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017