I was reviewing something and realized I was unsure about the
Stonebridge Park closure in 1999. Here's what I currently have:

Fri 1999-10-22 Last day of normal service.
Sat 1999-10-23 LU trains turn back at Queen's Park. Silverlink run a
shuttle from Stonebridge Park to Watford Junction.
Fri 1999-10-29 Last day of shuttle service.
Sat 1999-10-30 Stonebridge Park station closed for building work.
Mon 1999-11-01 Line reopens to both LU and Silverlink, but with
Stonebridge Park closed and trains non-stopping.
Wed 1999-11-10 Stonebridge Park re-opens.

Does anyone disagree with this?

My other question is what happened on Sat 30th and Sun 31st: were there
simply no trains at all on Silverlink, or did the shuttle run from
Watford Junction to Wembley Central?

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:

  #2   Report Post  
Old May 27th 05, 10:14 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 403
Default Stonebridge Park closure 1999

Clive Feather:
I was reviewing something and realized I was unsure about the
Stonebridge Park closure in 1999. Here's what I currently have:

Fri 1999-10-22 Last day of normal service.
Sat 1999-10-23 LU trains turn back at Queen's Park. Silverlink run a
shuttle from Stonebridge Park to Watford Junction.
Fri 1999-10-29 Last day of shuttle service.
Sat 1999-10-30 Stonebridge Park station closed for building work.
Mon 1999-11-01 Line reopens to both LU and Silverlink, but with
Stonebridge Park closed and trains non-stopping.
Wed 1999-11-10 Stonebridge Park re-opens.

Does anyone disagree with this?


Underground News does. This is covered in the December 1999 issue.

The first thing is that UN gives the first date as Friday 1999-10-21,
but since there was on such date, I think we can assume Clive had
that one right!

My other question is what happened on Sat 30th and Sun 31st: were there
simply no trains at all on Silverlink, or did the shuttle run from
Watford Junction to Wembley Central?


UN merely gives a southern terminus of "Silverlink Metro services".
If this means trains to Watford Junction, then the answer is that
they ran from Watford Junction to Wembley Central on *both* weekends,
the 23rd/24th and the 30th/31st, but were extended to Stonebridge
Park from Monday 1999-10-25 to Friday 1999-10-29 inclusive.

It also says that Silverlink County trains made extra stops at
Queen's Park and Wembley Central during the work. I suppose those
were on the main line.
--
Mark Brader A real Canadian science-fiction plot would be
Toronto about whether alien visitors were a federal or
a provincial responsibility. --Duncan Thornton

My text in this article is in the public domain.
  #3   Report Post  
Old May 27th 05, 07:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 125
Default Stonebridge Park closure 1999


"Mark Brader" wrote in message
...
Clive Feather:
I was reviewing something and realized I was unsure about the
Stonebridge Park closure in 1999. Here's what I currently have:

Fri 1999-10-22 Last day of normal service.
Sat 1999-10-23 LU trains turn back at Queen's Park. Silverlink run a
shuttle from Stonebridge Park to Watford Junction.
Fri 1999-10-29 Last day of shuttle service.
Sat 1999-10-30 Stonebridge Park station closed for building work.
Mon 1999-11-01 Line reopens to both LU and Silverlink, but with
Stonebridge Park closed and trains non-stopping.
Wed 1999-11-10 Stonebridge Park re-opens.

Does anyone disagree with this?


Underground News does. This is covered in the December 1999 issue.

The first thing is that UN gives the first date as Friday 1999-10-21,
but since there was on such date, I think we can assume Clive had
that one right!

My other question is what happened on Sat 30th and Sun 31st: were there
simply no trains at all on Silverlink, or did the shuttle run from
Watford Junction to Wembley Central?


UN merely gives a southern terminus of "Silverlink Metro services".
If this means trains to Watford Junction, then the answer is that
they ran from Watford Junction to Wembley Central on *both* weekends,
the 23rd/24th and the 30th/31st, but were extended to Stonebridge
Park from Monday 1999-10-25 to Friday 1999-10-29 inclusive.

It also says that Silverlink County trains made extra stops at
Queen's Park and Wembley Central during the work. I suppose those
were on the main line.


This post
http://groups-beta.google.com/group/...57f59c5d92e497
agrees with Mark that the Silverlink shuttles only ran to Stonebridge Park
Mon-Fri 0700-1900.

Peter Smyth


  #4   Report Post  
Old May 28th 05, 10:08 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 856
Default Stonebridge Park closure 1999

In article , Mark Brader
writes
I was reviewing something and realized I was unsure about the
Stonebridge Park closure in 1999. Here's what I currently have:

[...]
Underground News does. This is covered in the December 1999 issue.


Thanks.

UN merely gives a southern terminus of "Silverlink Metro services".
If this means trains to Watford Junction,


That's Metro, yes.

It also says that Silverlink County trains made extra stops at
Queen's Park and Wembley Central during the work. I suppose those
were on the main line.


Indeed - County are the trains from Northampton, Bletchley, etc.

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tunnel Park station closure Walter Briscoe London Transport 0 May 16th 15 11:54 AM
Slow train Bowes Park to Finsbury Park Recliner[_2_] London Transport 3 October 7th 13 08:33 PM
Finsbury Park cycle park ready TravelBot London Transport News 0 March 24th 06 09:23 AM
Five Day closure of Central Line (was surprised) Thomas Covenant London Transport 1 August 18th 03 09:35 AM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 10:11 PM


All times are GMT. The time now is 09:53 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017