London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old March 16th 07, 11:38 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default ELL/NLL interchange

The ELL phase 1 northern extension finishes at Dalston Junction station, but
Ken has stated that he will provide funds for early completion of the direct
link to the NLL, originally part of phase 2.

Am I correct in thinking that the first convenient cross platform
interchange station between ELL and NLL will actually be Canonbury or
Highbury and Islington? In which case would it be better not to refer to
Dalston 'Junction' for the reborn station, as it isn't actually a junction?
I'm presuming the distance between 'Junction' and 'Kingsland' will be
excessive for an LU style out of station interchange...

Paul S



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster on NLL services Paul Scott London Transport 2 June 8th 07 06:27 PM
NLL Closure / DLR to Stratford International Paul Corfield London Transport 32 November 25th 06 12:05 AM
Will Oyster PP be valid on the NLL ? Richard M Willis London Transport 12 June 23rd 06 01:13 PM
TfL / NLL / Metronet surface stock / tube stock / Croxley link John B London Transport 4 March 8th 06 09:51 PM
NLL via Crossrail tunnels Dave Arquati London Transport 0 September 10th 03 10:49 PM


All times are GMT. The time now is 05:43 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017