On 19 Dec, 08:43, Mwmbwls wrote:

He also described freight operator EWS as "barrow boys" and cited the
company as an example of where the committee had not been able to
clarify funding needs. "It became quite obvious when many committee
members visited its operations - I could not go - that attempts were
being made to pull the wool over our eyes. That is a glaring example
of a case where the funding was not understood. We could not get to
the bottom of what it was trying to do, or of what it wanted. The new
clause, if it is accepted, will push such organisations into a
position where they have to say precisely what their contribution to
the costs will be."


Just what financial contributions are the committee expecting from a
freight operator towards a new passenger railway whose aim seems to be
to eliminate "pesky" freight from existing joint use lines.

George

  #52   Report Post  
Old December 20th 07, 02:36 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2005
Posts: 94
Default The Ermine strikes back - The Crossrail Saga

Tom Anderson wrote:
On Mon, 17 Dec 2007, Graeme Wall wrote:

In message i
Tom Anderson wrote:

On Sun, 16 Dec 2007, Graeme Wall wrote:

In message i
Tom Anderson wrote:

Point taken, though, Twyford is a far more important station than i'd
realised.

It taps into a lot of traffic from the Wokingham area which would
otherwise have to take the slow service to Waterloo.

Ah, i see.

Hmm. It looks like a train from Wokingham to Waterloo takes 68
minutes; a
train from Twyford to Paddington which stops at Maidenhead only takes
32,
and one which stops at eight stations on the way takes 50 minutes.
Crossrail would presumably be more like 50 minutes.


I would hope an electrified service would do better than that.


How much difference does it make? And why? This is something that's
always puzzled me, actually - why are electric trains so much preferred
to diesels? Do they accelerate faster? I assume it's not a question of
top speed.


Asside from the comments made so far, electric equipment is generally
more reliable because they have fewer moving parts to wear out, and
don't vibrate as much to shake things loose.

Robin


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail consultation at that church round the back of Centrepoint Jim Brown London Transport 0 September 10th 04 02:14 PM
Calendar of Strikes David D London Transport 0 June 28th 04 12:18 PM
Omg! Yet more strikes Oliver Keating London Transport 15 December 21st 03 04:21 PM
The possible 'lager' strikes Badabing London Transport 14 December 10th 03 09:56 PM
London's Flash Mob Strikes Again!! John Peters London Transport 3 August 13th 03 09:26 PM


All times are GMT. The time now is 03:49 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017