[x-posted to uk.transport.london]
[original thread on uk.railway] On Sep 8, 8:59*am, JP wrote: EU has lent £1bn towards Crossrail according to Mayor Boris Excerpt from today's TfL press release: "The Crossrail project received a major boost today as Transport for London (TfL) announced that it has agreed a £1bn loan with the European Investment Bank (EIB) to finance part of their contribution to Europe's largest construction project." Read the rest of it he http://www.tfl.gov.uk/corporate/medi...tre/12515.aspx Apparently it is "one of the largest loans ever secured for a transport project". Of course the big hurdle that Crossrail has yet to pass is the comprehensive public spending review that's going to be instituted by Cameron and Osbourne when they inevitably gain power next year. |
#2
![]() |
|||
|
|||
![]() "Mizter T" wrote in message ... [x-posted to uk.transport.london] [original thread on uk.railway] On Sep 8, 8:59 am, JP wrote: EU has lent £1bn towards Crossrail according to Mayor Boris Excerpt from today's TfL press release: "The Crossrail project received a major boost today as Transport for London (TfL) announced that it has agreed a £1bn loan with the European Investment Bank (EIB) to finance part of their contribution to Europe's largest construction project." Read the rest of it he http://www.tfl.gov.uk/corporate/medi...tre/12515.aspx Apparently it is "one of the largest loans ever secured for a transport project". Of course the big hurdle that Crossrail has yet to pass is the comprehensive public spending review that's going to be instituted by Cameron and Osbourne when they inevitably gain power next year. I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? |
#3
![]() |
|||
|
|||
![]() |
#4
![]() |
|||
|
|||
![]()
On Sep 8, 3:19*pm, wrote:
I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? Of course it *can*: see the 1970s Channel Tunnel, which stopped after they'd dug 400m and bought the TBMs. It would be stupid and expensive to do so, but we are talking the Camerosborne party here... -- John Band john at johnband dot org www.johnband.org |
#5
![]() |
|||
|
|||
![]()
In article ,
wrote: I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? They can stop work at any time, although the nearer they are to the end the less likely they are to abandon the work done so far. -- :wq |
#6
![]() |
|||
|
|||
![]() wrote in message ... "Mizter T" wrote in message ... [x-posted to uk.transport.london] [original thread on uk.railway] On Sep 8, 8:59 am, JP wrote: EU has lent £1bn towards Crossrail according to Mayor Boris Excerpt from today's TfL press release: "The Crossrail project received a major boost today as Transport for London (TfL) announced that it has agreed a £1bn loan with the European Investment Bank (EIB) to finance part of their contribution to Europe's largest construction project." Read the rest of it he http://www.tfl.gov.uk/corporate/medi...tre/12515.aspx Apparently it is "one of the largest loans ever secured for a transport project". Of course the big hurdle that Crossrail has yet to pass is the comprehensive public spending review that's going to be instituted by Cameron and Osbourne when they inevitably gain power next year. I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? They are only doing preparatory work. It would be stupid to stop part way through any one individual piece of work, but there's no reason why they can't decide to delay boring the main tunnel for a year or 20 (we have been waiting 40 years already) tim |
#7
![]() |
|||
|
|||
![]() |
#8
![]() |
|||
|
|||
![]()
On Tue, 08 Sep 2009 18:18:43 +0100, Arthur Figgis
wrote: wrote: I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? That is what happened to the Channel Tunnel in 1970-something. That isn't quite the same as what happened to the Channel Tunnel in, I think, 1974. The Channel Tunnel wasn't cancelled, it just never got the go-ahead to start. There was a feasibility study and associated demonstration project under way when Harold Wilson's Labour government came into power in 1974. It was hoped that, based on the success of the demonstration project, the construction of the Channel Tunnel would be authorised as a joint British/French publicly financed project. The feasibility study showed that a tunnel could have been built through the chalk marl. The demonstration project was a success and showed that a tunnelling machine could excavate and line a short section of the small diameter service tunnel in competent chalk marl. But that's all it showed. When Labour came to office, the country was on a three day week with rotating power cuts for all but essential services. The government's tax take had fallen dramatically because industrial production had been badly disrupted due to the coal miners' strike, reducing corporation tax receipts, and because working hours were much reduced, reducing income tax. In short, there wasn't any money, and a grandiose project like the Channel Tunnel was never going to be given the go-ahead at a time like that. So the demonstration project was completed and the feasibility study was written up. The tunnel workings were then sealed. Then nothing happened, literally. Nothing was "cancelled", because there was nothing to cancel. With the benefit of hindsight, we can now say that it was probably a good thing that the project didn't get the go-ahead at that time. The ground investigation had been rather perfunctory and some major geological problems were missed. Subsequently, in the 1980s, a more detailed ground investigation was carried out. This also failed to identify geological problems on the English side which caused serious problems when the project was under way. The detailed ground investigation successfully identified some even more severe problems on the French side. As a result, the French tunnelling contractors invested a lot of money in very sophisticated machines which offered full support of the excavated face with a bentonite slurry. This was a slower and more costly method of tunnelling but the French tunnellers coped with everything the ground conditions threw at them and more or less stayed on programme. Indeed, they went so well compared to our tunnellers that they continued far beyond the original agreed point and into English territory. On the English side, a more optimistic view was taken and face support was not included. In the event, the ground conditions were not as bad as on the French side, but bad enough that the lack of face support and huge ingress of water caused severe delays to the tunnelling. Had the Channel Tunnel been given the go-ahead in 1974, the optimistic view would have prevailed on both sides because of the inadequate site investigation, and the sophisticated machines used by the French were not available at that time. So there would have been major problems - even worse than in the Tunnel that was built - and the whole cost would have been borne by taxpayers, which would have been a disaster. It is quite possible that the project would have had to have been abandoned until better technology became available. In the event, the problems were mainly confined to the English side, and the whole of the massive cost overrun was borne by investors in Eurotunnel and the lending banks, sparing the taxpayer almost all of the pain. As taxpayers, I think we should be relieved that this burden did not fall on us. With the severely damaged economy that was left to Labour by the grossly incompetent Heath/Barber Tory government of 1970-74, the public finances could not have sustained such a big hit. With Crossrail, two of the three major tunnelling contracts have just gone out to tender. So, unlike the Channel Tunnel in 1974, there *is* a Crossrail project in place. I believe the Crossrail team are aiming to have the tunnelling contracts let and started on site before the general Election, in the hope that it would make the project very difficult to cancel. We will see, ;-) |
#9
![]() |
|||
|
|||
![]()
On Sep 8, 7:19*am, wrote:
"Mizter T" wrote in message ... [x-posted to uk.transport.london] [original thread on uk.railway] On Sep 8, 8:59 am, JP wrote: EU has lent £1bn towards Crossrail according to Mayor Boris Excerpt from today's TfL press release: "The Crossrail project received a major boost today as Transport for London (TfL) announced that it has agreed a £1bn loan with the European Investment Bank (EIB) to finance part of their contribution to Europe's largest construction project." Read the rest of it hehttp://www.tfl.gov.uk/corporate/medi...tre/12515.aspx Apparently it is "one of the largest loans ever secured for a transport project". Of course the big hurdle that Crossrail has yet to pass is the comprehensive public spending review that's going to be instituted by Cameron and Osbourne when they inevitably gain power next year. I thought Crossrail was being built? Because they have already started work, are you saying this work could be stopped? Has actual tunneling started? I thought it was just station boxes under other construction and the like? |
#10
![]() |
|||
|
|||
![]() On Sep 8, 7:13*pm, 1506 wrote: Has actual tunneling started? *I thought it was just station boxes under other construction and the like? No tunnelling is happening. AIUI only the Canary Wharf (aka Isle of Dogs) station box has started construction proper. Otherwise I think it's all pretty much various preparatory works. Tottenham Court Road tube station is in the early stages of being reconstructed which all links in with Crossrail, but I don't think any major Crossrail centric works are due to happen there for a while (not too up on the TCR timetable though I admit). The big kick off of major construction work is yet to come. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport |