On Jan 24, 7:03*pm, Paul Corfield wrote:
On Sun, 24 Jan 2010 10:34:56 -0800 (PST), Mizter T
wrote:
On Jan 24, 5:50*pm, "Paul Scott"
wrote:
Mizter T wrote:
The NLL/WLL were never converted for DOO, but the DC Line was. For
whatever reason there's some issue with the 378s running on DOO mode,
so they haven't appeared in service on the DC Line.
Given the route is already DOO, the basic class of train is already in
widespread use in DOO areas, and Bombardier are unlikely to have 'reinvented
the wheel' equipment wise, you would hope it's a minor issue.
Maybe the drivers want extra cash for looking at internal monitors rather
than external mirrors or something...
There were those rumblings of discontent at LOROL a while back. Did
the RMT go on a membership drive after the establishment of LO and
LOROL...
My guess as to the reason for the delay will be to do with the camera /
monitor interface. The DC line is peculiar because it has the
interworking with the Bakerloo line whose stock is of a very different
profile. *I also believe that the responsibility for the CCTV system
varies depending on location *and* platform direction. Getting it all
correctly aligned and working for three stocks is probably proving more
than a little difficult. *The unions may be somewhere in the background
but probably only in the context of safety - there are formal procedures
and consultation over things like the platform / train interface.
I understood that the Electrostar family CCTV was all done via on-
board cameras though, so the existing system for 313s and Bakerloo
stock will not be used by the 378s.
|