Long DLR Train
On 03.02.10 19:47, Clive wrote:
In message , "
writes
I would have thought so, I must be cheaper to use 70 lbs a yard steel
than 120 lbs a yard steel in base product alone before any pre-forming
takes place.
What do you mean by base product?
Steel bar to be converted into rails.
Billets, you mean.
|