View Single Post
  #1   Report Post  
Old February 28th 10, 07:20 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
E27002 E27002 is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2009
Posts: 209
Default Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic!

On Feb 28, 12:44*am, Mark A wrote:
On 28/02/2010 08:04, Willms wrote:

* *Mr. Adonis has concluded from the experience with the WCML upgrade,
that it might be cheaper to build new instead of upgrading existing
lines.


M1/M6 Parkway station and Leicester.


Electrify the London to Birmingham route at 25kV. Gradual
straightening of the kinks caused by removal of the platform loops
(e.g.)
Gerards Cross. In time some sections pushed to 125, 135, or even 145
mph.

There needs to be a tidying up of the interchanges with TfL's Central
Line. The Underground tracks should become the center pair. Stations
should be dual islands with cross platform interchange with Chiltern
Local Services. In time a third out pair could be added for
expresses.