Default Planning Permission Required for extra track at South Ruislip!

On 4 Apr, 17:09, Dominic wrote:
On Apr 4, 1:11*pm, Bruce wrote:

The Evergreen 3 project investment has been approved by DfT Rail, but
that in no way negates the need to follow the normal planning process.


For info, I believe the application under discussion can be found on
London Borough of Hillingdon's planning webpage by searching for
planning application reference 66712/APP/2010/103http://www.hillingdon.gov.uk/index.jsp?articleid=10058
Its location is Northolt Junction Civic Way Ruislip and it proposes
"Track and junction improvements involving widening the existing up
line embankment for 1.2km; stabilising the existing embankment; laying
a second track South of existing up main line; provision of new
junctions; replacing the existing single track bridge over Civic Way
with a double track bridge; infilling redundant under bridge and
ancillary works."
Documents including a planning statement and plans are included with
the application.
Cross-posted to uk.transport.london.
Kind regards, Dominic


Thanks for the link - some interesting documents:

http://w09.hillingdon.gov.uk/images/..._103/010_1.pdf


http://w09.hillingdon.gov.uk/images/..._103/010_1.pdf