On 4 Apr, 18:06, Chafford wrote:
On 4 Apr, 17:09, Dominic wrote:
On Apr 4, 1:11*pm, Bruce wrote:
The Evergreen 3 project investment has been approved by DfT Rail, but
that in no way negates the need to follow the normal planning process..
For info, I believe the application under discussion can be found on
London Borough of Hillingdon's planning webpage by searching for
planning application reference 66712/APP/2010/103http://www.hillingdon.gov.uk/index.jsp?articleid=10058
Its location is Northolt Junction Civic Way Ruislip and it proposes
"Track and junction improvements involving widening the existing up
line embankment for 1.2km; stabilising the existing embankment; laying
a second track South of existing up main line; provision of new
junctions; replacing the existing single track bridge over Civic Way
with a double track bridge; infilling redundant under bridge and
ancillary works."
Documents including a planning statement and plans are included with
the application.
Cross-posted to uk.transport.london.
Kind regards, Dominic
Thanks for the link - some interesting documents:
http://w09.hillingdon.gov.uk/images/...PP_2010_103/01...
http://w09.hillingdon.gov.uk/images/...PP_2010_103/01...
Non technical summary is he
http://w09.hillingdon.gov.uk/images/..._103/016_3.pdf