View Single Post
  #7   Report Post  
Old April 11th 10, 10:46 AM posted to uk.transport.london
martin martin is offline
external usenet poster
 
First recorded activity at LondonBanter: Dec 2007
Posts: 153
Default No FT, no ELL slide show

On Apr 10, 1:07*am, "
wrote:

The slide show was also incorrect in that it said that the Dalston
Junction-Highbury & Islington extension would be opened by January 2011.
IIRC on this group, however, it is due to open in May 2011.


A pedant would also point out that the Brunels' tunnel wasn't the
first underwater tunnel, but the first under a navigable river.