View Single Post
  #1   Report Post  
Old April 12th 10, 01:33 PM posted to uk.transport.london,uk.railway
[email protected] boltar2003@boltar.world is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Upgrading sub surface tube lines to 750V

I read about this in wikipedia but is it actually going to happen? If so what
will happen on sections where tube and sub surface stock run on the same track
- ie raynors lane to uxbridge and acton town to ealing common. Will these
sections be kept at 630V or will the piccadilly stock be able to handle 750V
anyway?

B2003