Upgrading sub surface tube lines to 750V
The WCML modernisation scheme uses (mostly!) 400 V three-phase, but
this has not been a great success owing to the higher currents (and
therefore greater number of sources of supply, known as Principal
Supply Points or PSPs) required.
Ummm.. Rather interesting this but this 400 volt 3 phase supply was
"difficult" in quite what way for signalling purposes?..
--
Tony Sayer
|