View Single Post
  #6   Report Post  
Old May 30th 10, 03:34 PM posted to uk.transport.london
Paul Scott Paul Scott is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Ealing Broadway to Wandsworth Road


"Dr. Sunil" wrote in message
...
On 29 May, 13:36, "Paul Scott" wrote:


Posts elsewhere suggest it is to do with not allowing 'foreign DMUs' on
the
GW because they cannot be rescued due to coupling incompatability...


Oh I presumed it would be a 377/2 - DC from Wandsworth as far as Mitre
Bridge then AC after that.


That would have been too simple... There are a couple of significant
non-electrified bits, eg to get from the NLL to the GW reliefs around Acton
somewhere; and the route from Mitre Bridge Jn loses its OHLE once past the
WCML and turning round towards the SW direction. (IYSWIM - it is AC as far
as whichever WCML tracks that the SN Milton Keynes service uses, but then
DMU required...)

The whole idea of this service is a complete waste of everyone's time, and
surely must have already cost the railway more than it would cost the DfT to
close it...

Paul S