View Single Post
  #5   Report Post  
Old August 2nd 10, 02:37 PM posted to uk.transport.london
[email protected] furles@mail.croydon.ac.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 110
Default Stratford platform 3a

On 31 July, 16:08, "Dr. Sunil" wrote:
As of this morning, a lot of the clutter and barricades (platform
side) had been removed from the new Central westbound platform (3a),
though the concourse accesses were still blocked off by hoardings.
Anyone know when it will open?


So, how many platforms will Stratford have when completed? They now
seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and
10a need to be added, making 19 in total, serving 18 tracks; is that
correct? Quite a change from when I first got to know the station in
the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other
than occasional use. Even 1 and 2 were only used by the little-known
service from north Woolwich to Tottenham Hale.

Does anybody know when platforms 12 and the old 13 were closed, and
the part of the subway leading to them was bricked up? When the old
subway was being cleaned up, the wall removed and the steps up to the
platform re-built an old poster frame had been dragged out of one of
the doorways leading off this subway, along with some rotten wood, and
there was the remains of a timetable on it, which listed a few trains
to Hertford East from platform 12, but I couldn't see any date on it.
I always knew that the station, and the area in general, was going to
see a change in its fortunes. The station really was in a terrible
state at that time, despite the fact that it was only about 25 years
since the last refurbishment fot the Central Line extension and the
Shenfield electrification.