View Single Post
  #11   Report Post  
Old August 4th 10, 10:19 AM posted to uk.railway,uk.transport.london
[email protected] boltar2003@boltar.world is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Crossrail rolling stock PIN

On Wed, 4 Aug 2010 02:43:31 -0700 (PDT)
bob wrote:
The bigger problem is that UK platforms impinge on the UIC gauge,
which is full width practically down to rail head level. So to run
UIC stock, you will need to rebuild every platform on the route, and
in so doing make those platforms unusable by conventional UK rolling


Fair point. But I'm sure they could build some sort of compromise stock
that could use the full UIC height and also width above platform level
that would still be within UK gauge below platform level. To me it just
seems daft to limit a brand new line to the UK loading gauge which is
demonstrably inadequate on all busy rail lines.

B2003