View Single Post
  #19   Report Post  
Old August 4th 10, 01:08 PM posted to uk.railway,uk.transport.london
[email protected] boltar2003@boltar.world is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Crossrail rolling stock PIN

On Wed, 4 Aug 2010 12:17:34 +0100
Roland Perry wrote:
If they want to really future proof it they should build UIC gauge double
decker trains instead of ****ing around with piddly UK gauge EMUs that
will be packed from day 1. It won't happen of course because there might
be the odd bridge that'll need raising by a foot on the out of london routes.
Obviously this would be a huge expense compared to digging 10 miles of
tunnel under london....


As only a third of the cost of the current project is the part tunnelled
under London, I think you may be onto something here.


You're kidding me? What are they doing on the pre existing lines, gold plating
the platforms??

B2003