View Single Post
  #1   Report Post  
Old August 12th 10, 01:04 PM posted to uk.transport.london,uk.railway
[email protected] boltar2003@boltar.world is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default LU A stock over NR routes

Now that the S stock trains are slowly going to be introduced into service how
will the A stock go to scrap? Its apparently 10cm wider than the maximum
network rail loading gauge (according to an article I read in Rail today) so
will they be able to move it by rail over some specially cleared routes or
will it have to go by road?

B2003