View Single Post
  #5   Report Post  
Old August 12th 10, 03:01 PM posted to uk.transport.london,uk.railway
Andy Elms Andy Elms is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2010
Posts: 5
Default LU A stock over NR routes

On 12 Aug, 14:04, wrote:
Now that the S stock trains are slowly going to be introduced into service how
will the A stock go to scrap? Its apparently 10cm wider than the maximum
network rail loading gauge (according to an article I read in Rail today) so
will they be able to move it by rail over some specially cleared routes or
will it have to go by road?


Ah, but, in kinematic envelope terms the vehicles are relatively short
(16m according to wackypædia) so the throw on curves would not be as
substantial as an equiv. 20m carriage.

Need to sit down and do the geometry to work out how much, mind

AE