Thread
:
Javelin Trains Side-lined
View Single Post
#
29
September 9th 10, 08:27 AM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Javelin Trains Side-lined
On Wed, 08 Sep 2010 16:00:35 -0500
wrote:
London's Olympic bullet trains have been modified after commuters
raised concerns over _frightening and alarming_ wobbles at 140mph.
The passengers _ who pay premium fares to use Britain's fastest
domestic service _ complain of _turbulence_ as the trains pass through
tunnels between St Pancras and Kent.
[snip]
Curious. The trains are timetabled at only 125MPH, with higher speeds only
used to catch up when running late.
The whole 140mph thing was a marketing con. They've simply reproduced 1970s
era technology and managed to get it wrong.
I wonder if Hitachi sub contracted out any part of the train suspension to
the same idiots who built the DLR trains which wobble all over the place?
B2003
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]