Victoria line breakdown
Heard Peter Hendy beign interviewed on LBC this morning. He said that the
breakdown of the new train that ended up with 400 people being walked along
the tracks was down to a brake pipe that came lose because it hadn't been
fitted properly in Derby.
Anyone have any more info? If its true it sounds like there could be some
quality control issues up at Bombardier.
B2003
|