View Single Post
  #2   Report Post  
Old November 25th 10, 10:59 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
1506[_2_] 1506[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2010
Posts: 252
Default Thameslink programme to go ahead "in it's entirety"

On Nov 25, 10:37*am, "Mizter T" wrote:
Amongst a number of points covered in SoS Hammond's announcement this
morning was this one:

---quote---
Today, I can confirm we will fund and deliver the Thameslink programme in
its entirety, virtually doubling the number of north-south trains running
through central London at peak times. But the original programme for the
rebuilding of London Bridge was always ambitious, with substantial risks
around delivery, and operation of existing services, during construction.
To reduce these risks, we have re-profiled the delivery of the programme to
achieve completion in 2018. *This will enable Network Rail to make further
efficiencies to their design and delivery programme.
---/quote---

Source:http://www.dft.gov.uk/press/speeches...ts/hammond2010...

So, it appears as though the whole shebang will go ahead as originally
envisaged, i.e. including Key Output 2 (of which the extensive Bermondsey
dive-unders on the approaches to London Bridge are a part, for instance).


Excellent news. And, given the circumstances, surprising. A good day
for railways of the UK's Southeast, and especially London.