View Single Post
  #7   Report Post  
Old November 25th 10, 03:14 PM posted to uk.transport.london,uk.railway
Bruce[_2_] Bruce[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Thameslink programme to go ahead "in it's entirety"

(Roy Badami) wrote:
In article ,
Bruce wrote:
"Richard Hunt" wrote:

It was delayed.

Basically, Thameslink 2000 is what we are discussing.


Right. It was renamed "The Thameslink Programme" once the delays got
so long that the 2000 name was just too emabarassingly silly.



"Thameslink 2018" doesn't have quite the same ring to it. ;-)