View Single Post
  #136   Report Post  
Old November 28th 10, 07:57 PM posted to uk.transport.london,uk.railway
TimB[_2_] TimB[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2009
Posts: 38
Default Thameslink programme to go ahead "in it's entirety"

On Nov 28, 7:51*pm, Roland Perry wrote:
In message
, at
11:16:56 on Sun, 28 Nov 2010, TimB remarked:

The IEP can solve the white space issue on the ECML fast tracks (ie the
ex Cambridge Cruisers), but there's also the stoppers - who can live in
their own space on the slow tracks and flow through Thameslink rather
than terminating at Kings Cross.


Except that there are no slow lines for a few miles north of Welwyn.


There are a certain number of paths through Welwyn, increasing the top
speed of 2tph from 100mph to 125mph isn't going to change that. What's
the track speed there, anyway?
--
Roland Perry


105 through the tunnels - the turnouts to/from the slows are 70, which
may be more relevant.
Tim