View Single Post
  #22   Report Post  
Old January 7th 11, 01:49 PM posted to uk.transport.london,uk.railway
[email protected] boltar2003@boltar.world is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Jubilee Line ATO

On Fri, 7 Jan 2011 14:22:41 +0000
Mike Bristow wrote:
["Followup-To:" header set to uk.transport.london.]
In article ,
d wrote:
So fill us in on how removing a set of points increases operational
flexibility then.


It doesn't.

But the cost of that operational flexiblity is increased disruption
(points fail more often than plain track) and increased cost (points
need more maintenance then plain track).


If they're clipped out of use most of the time they can't fail short of a
rail breaking.

B2003