View Single Post
  #7   Report Post  
Old January 14th 11, 04:25 PM posted to uk.transport.london
Paul Scott[_3_] Paul Scott[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default North dock drained for crossrail

wrote in message
...
Just read they've drained the north dock down at canary wharf for xrail.


Is this something new?

The space inside the cofferdam, where the station box is to be built, was
drained in Feb/Mar 2010 IIRC. What, if anything, is going on outside the
cofferdam?

Paul S