BBC: Thames cable car given go-ahead
In message , at 14:51:30 on
Fri, 28 Jan 2011, Recliner remarked:
The London Development Agency is contributing £1.21m to the cost of the
project, which in December was estimated at a possible £40m.
The cable car was originally projected to cost £25m.
So the cost will eventually be about £70m !
--
Roland Perry
|