View Single Post
  #3   Report Post  
Old February 5th 11, 11:04 AM posted to uk.transport.london
Recliner[_2_] Recliner[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 2,008
Default Central Line not stopping at Stratford this morning

wrote in message

On 05/02/2011 00:19, Paul Corfield wrote:

I wonder why they didn't simultaneously carry out signalling upgrades
on the Metropolitan line segments that run parallel to the Jubilee
line since the S stock is most probably equipped with ATO capacity.


The subsurface resignalling is a different (Metronet-originated, but now
re-tendered) project, whereas the Jubilee resignalling was a Tube Lines
project.

I believe they will (inevitably) be using different systems, another
long-term legacy of Gordon Brown's disastrous Underground PPP contract.
The Jubilee line uses Thales, which didn't make the shortlist for the
subserface lines. The resignalled Picc will now use the same system as
the subsurface lines (with which it shares tracks), rather than Thales
as originally planned.