View Single Post
  #12   Report Post  
Old July 16th 03, 01:44 PM posted to uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Dot Matrix replaces big boards at L/Pool St

Dave wrote in message ...
Boltar writes
More than likely. It took them 3 years to sort out all the escalators
at Holborn. Considering it took far less time than that to originally
build the station including installing the escalators you can only
laugh at the absurdity of it all.


It's often the case that building something is a lot quicker than
dismantling and replacing parts of it.

If the factory can build a car from scratch on less than an hour - why
is it that the garage takes two days to replace the engine?


Because they don't have access to the original factory equipment or manpower
to do it quicker. When you have those facilities you CAN do it as witnessed by
rally teams who can change an engine in 30 minutes. And as LU is fond of
telling us these escalators have gone back to the manufacturers factory
for some TLC where presumably they have all the people and equipment they
need. So that excuse doesn't wash. Next....

B2003