View Single Post
  #4   Report Post  
Old July 29th 11, 10:51 AM posted to uk.railway,uk.transport.london
Paul Scott[_3_] Paul Scott[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default Thameslink North South connections

"Mizter T" wrote in message
...

V interesting - thanks. Hadn't quite realised that there was a plan to
terminate some trains at Bellingham.


Yes - that's a bit unannounced, otherwise the southern origins are pretty
close to the 2008 SL RUS.

I think Bellingham was previously a stopper from Orpington. Caterham and
Tattenham Corner were shown as East Croydon/Norwood Jn starts; and the
Tonbridge corridor services were previously shown as Tunbridge Wells and
Paddock Wood (now Ashford).

What is clearer from the multi colour table in the RUS is that the majority
of the 'southern' services are grouped as 4 tph services on most of their
route lengths. E.g. 4 tph via each of Redhill, Purley, Haywards Heath,
Orpington and Bromley South.

Paul S